Ferro-alloys.com:ERAMET: 2020 FULL-YEAR RESULTS
2020 targets achieved for the Mining and Metals division:
- 5.8 Mt of manganese ore produced (+22% vs 2019), more than 6 Mt of transported ore (+30%) in Gabon.
2021 Outlook:
- Growth in production to 7 Mt of manganese ore as soon as 2021, thanks to the opening of the new mining plateau in Gabon at end-2020 (more than +20% vs 2020)
Copyright © 2013 Ferro-Alloys.Com. All Rights Reserved. Without permission, any unit and individual shall not copy or reprint!
- [Editor:zhaozihao]
Tell Us What You Think